Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Schluter Home Additions & ADU: The Irvine Owner’s Guide
We build and finish home additions and ADUs in Irvine using Schluter Systems waterproofing and tile-assembly components, and a full addition runs $45,000 – $130,000 depending on scope, with ADUs at $90,000 – $220,000. The “part” homeowners come to us about is almost always a Schluter membrane or profile that has started to loosen where a new bathroom meets an existing slab. You usually find it the same way everyone does: a soft, hollow tap under a floor tile along the addition’s exterior wall, or grout that keeps cracking in the same line every few months no matter how many times it gets patched.
That’s the moment the project stops being abstract. A finished addition or ADU lives or dies on what was installed under the tile, and Schluter is the name most Irvine owners end up searching because the product is printed on a shower niche edge or a drain flange.
Groundwork Construction Co. of Irvine is an independent construction company. We’re not affiliated with Schluter, and we don’t sell parts.
Key Takeaways
- Most Schluter failures in Irvine trace to installation, not the product: patchy thin-set coverage, no prefill on wide joints, or membrane run over a contaminated slab.
- A failed shower-side membrane is a gut-to-substrate repair, not a patch. Budget $9,000 – $28,000 for the bathroom scope and $45,000 – $130,000 for a full addition if framing or slab work is involved.
- No DIY-safe repair exists for a failed waterproofing layer under finished tile. Once water is behind the membrane, surface fixes only defer the damage.
- Every job is covered by the 730-Day Done Right Promise.
Which Schluter Models This Applies To
Schluter’s residential line splits into a few families, and knowing which one you’re looking at changes the repair entirely. Ditra is the uncoupling membrane for floors: the orange roll with the dovetail grid that separates tile from substrate movement. Kerdi is the waterproofing membrane for showers and wet areas, usually white or orange sheet with a printed fleece face. Kerdi-Board is the foam backer board that replaces cement board in shower walls. Profiles like Schluter-RENO, JOLLY, and QUADEC are the trim edges you’ll see at tile perimeters and stairs. On an addition or ADU, all of them show up in the same footprint: Kerdi-Board on shower walls, Kerdi sheet on the pan, Ditra across the bathroom floor transition, and a profile at the doorway where new tile meets existing flooring.
Identification is straightforward once you’re looking. Schluter prints the product name and dimensions directly on the membrane fleece and on profile packaging, and profile size is stamped as a number in millimeters, like “RENO-U 10” for a 10mm edge. Measure before you order anything: membrane rolls come in widths that matter at a curb or a niche return, and profiles are sized to tile thickness, not to the gap. Get the model and the millimeter stamp, not the color.
On OEM versus aftermarket: Schluter is a system, and the parts are designed to work as a set. Their thin-set (Schluter-SET) and their sealant (Kerdi-Fix) are matched to how the fleece bonds. A generic unmodified thin-set can work under Ditra, but a “modified” thin-set over a Schluter membrane in the wrong assembly is where we see delamination. We install Schluter-approved materials in the assembly rather than substituting. Other finish brands we work alongside on Irvine additions include KraftMaid, Cambria, and Silestone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Schluter Home Additions & ADU Is Failing
Waterproofing failures announce themselves slowly. These are the ones we see most in Irvine additions and ADUs:
- Grout cracking in a repeating line along the addition’s exterior wall. Usually movement or an uncoupling layer that was never bonded fully, so the tile and the slab move independently. Patching grout hides it for a season, then it returns.
- Hollow, lifted tap tone under floor tile near the shower curb. That’s thin-set coverage that fell short of the 95% requirement Schluter specifies for wet-area installations. The tile is sitting on voids, not on the membrane.
- Musty smell from the shower with no visible leak. Kerdi was overlapped the wrong direction, or a seam was sealed with the wrong sealant. Water gets behind the fleece and never drains back out.
- Lipped tile at the Kerdi-Board joints. Board wasn’t shimmed flat before waterproofing, so the membrane follows the dip and the tile edges telegraph it. Cosmetic until it’s a trip hazard at a doorway.
- Efflorescence or white crust at the profile line where new tile meets existing flooring. Moisture is wicking at the transition, often because the Schluter profile was set without proper sealant at the movement joint. Irvine’s dry summers and damp marine-layer mornings cycle that joint hard.
Replacement Cost & What’s Included
A failed waterproofing assembly isn’t a part swap. The cost is the tear-out and re-tile. Here’s how it breaks down in Irvine, with upfront pricing and no surprises on the number you’re quoted.
| Scope | Irvine Price Range |
|---|---|
| Home addition (full scope, foundation to finish) | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion (ADU path) | $30,000 – $80,000 |
| Bathroom remodel inside the addition (failed shower or pan) | $9,000 – $28,000 |
| Walk-in shower rebuild with Schluter assembly | $4,500 – $12,000 |
| Small bathroom remodel (powder room, half bath) | $5,000 – $12,000 |
What drives the range: how much finished tile has to come out to reach the failed layer, whether the framing or slab shows water damage, and whether the assembly has to be rebuilt wet-wall to pan. Every quote is written line-item, materials and labor separated, and locked before demo starts. Nothing gets added because the wall opened up. Work is covered by the 730-Day Done Right Promise, and if it’s not done right, we make it right.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
There’s a short list of things you can safely do yourself. Probe for hollow tile with a plastic tap and mark the boundary of the sound change. Photograph the printed Schluter product name on any exposed fleece or profile so we know exactly what’s there. Check around the shower curb and drain flange for movement. Pull a baseboard and feel the drywall behind it for softness. That’s diagnostics, and it saves time.
What you can’t do is fix it. Setting a new membrane over a failed one traps the moisture. Patching grout over an uncoupled floor leaves the tile spongy. And if the addition or ADU is recent, tearing into a waterproofing assembly before the original installer has a chance to look at it can affect what’s covered. Beyond the technical side, the work involves a bonded waterproofing system under finished tile, and a mistake there doesn’t show up for months, by which time the framing or the subfloor behind it has absorbed the damage. This is one where calling first is cheaper than a second attempt.
Call Groundwork Construction Co. of Irvine at (888) 578-4462 for a free estimate. A live person answers, 24 hours a day. We’ll look at the assembly, tell you honestly whether it’s a repair or a rebuild, and put a written number in front of you before anything gets demoed.
FAQs
A properly installed Schluter waterproofing assembly should last 25 years or more, and the membrane product itself isn’t usually what fails. The variable is installation: coverage, seam direction, and material compatibility. Irvine’s dry inland heat and coastal morning damp put a lot of thermal cycling on exterior addition walls, so a sloppy thin-set bed shows up as hollow tile within a few seasons rather than a decade.
No, not once water is behind it. A failed Kerdi or Ditra layer under finished tile has to come out to the substrate. Surface sealers and grout patches buy a few months at most. A shower assembly sometimes gets a smaller repair if the failure is isolated to one wall and the pan is intact, which is why we inspect before quoting.
A shower rebuild with a new Schluter assembly typically runs one to three weeks for a bathroom, and a full addition remediation can run four to twelve weeks depending on how much framing is affected. We don’t compress waterproofing cure time to hit a date. That’s the step that gets skipped on fast jobs.
We source Schluter-approved materials through trade suppliers and install the system as specified, matched to the assembly the job needs. We don’t sell parts and don’t stock them on a truck. For Irvine additions we specify the assembly on the written scope before the permit is pulled, so the materials arrive matched to the drawing rather than improvised on site.
Ready to price it?
If a membrane or profile in your Irvine addition or ADU has failed, the next step is a look at the actual assembly, not a phone guess. Call Groundwork Construction Co. of Irvine at (888) 578-4462 to schedule your free estimate. Background-checked, uniformed technicians handle every job, 0% financing for 18 months is available, and projects over $10,000 get $1,000 off. From foundation to finish line, one contractor stays accountable to the final walkthrough.
Written by the team at Groundwork Construction Co. of Irvine, serving Irvine and nearby areas.