A Groundwork company - serving Irvine, CA

PGT Driveway & Pavers in Irvine, CA

Driveway & paversDriveway & pavers
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

PGT Driveway & Pavers: The Irvine Owner’s Guide

We install and repair PGT-compatible driveway and paver systems in Irvine, with paver driveway installation typically running $7,000 – $18,000 and concrete driveway installation $4,500 – $12,000. Most Irvine owners discover a failing PGT paver system the same way: a hairline crack that spreads through the salt-and-pepper finish after a wet winter, or a paver that rocks underfoot when the irrigation line underneath it starts leaking. Once that first stone shifts, the failure moves fast along the joint sand.

Call (888) 578-4462

Key Takeaways

  • PGT pavers are matched byte-for-byte on profile, color lot, and thickness – a generic paver won’t blend into an existing field.
  • Our technicians have up to 12 years of experience with PGT-compatible installations.
  • Every driveway and paver project is covered by the 730-Day Done Right Promise.
  • We’re an independent provider, not affiliated with PGT – we source compatible components to match your existing system.

Which PGT Models This Applies To

PGT paver systems show up across a wide range of Irvine homes, from the courtyard drives in Woodbridge to the long side-yard aprons near Northwood. What matters isn’t the model name stamped on a brochure – it’s the physical spec of the stone already on your driveway. PGT’s residential paver lines come in standard profiles (typically 60mm or 80mm thickness for vehicular areas, 20mm for the border course) and a defined color range. Before we quote a single replacement, we measure the existing course, verify thickness, and match the color lot as closely as the current PGT catalog allows. That last step is where most homeowners get burned by a cheaper contractor: their “matching” paver is a close cousin at best, and the mismatch glares in daylight.

The OEM-versus-aftermarket decision here is simpler than it is for mechanical parts. PGT-compatible pavers from a quality aftermarket supplier are functionally identical to OEM – same base concrete formulation, same texture. The difference is availability and how fast we can source a color-lot match. We never carry stock; we order the matched stone specific to your job. If you also have KraftMaid, Cambria, or Silestone surfaces elsewhere on the property, our crew can look at the whole exterior scope while we’re there.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Signs Your PGT Driveway & Pavers Is Failing

The failure modes on a PGT paver driveway are consistent, and each one points to a specific cause you can act on:

  • Clipped or lifted pavers along the drive edge. Usually base failure – the aggregate underneath has settled or wasn’t compacted correctly when the driveway was first laid. Edge restraint has also loosened and lets the course spread outward.
  • Rocking stones underfoot. A single paver that moves means the bedding sand has washed out beneath it, often from a slow irrigation leak or roof runoff channeling along the base of the drive.
  • Widespread efflorescence (white mineral bloom). Moisture trapped under the pavers is wicking up through the surface and depositing salts. In Irvine, this is common after the seasonal wet stretch when drainage flow across a slightly low slope slows down.
  • Joint sand washing out repeatedly. If you’re re-sanding every year, the joints aren’t holding – the wrong sand type was used, or the pavers were never sealed and the surface is draining into the joints instead of off the driveway.
  • Color fade or chalking on south-facing runs. UV exposure over years strips the surface finish on the most sun-baked section. It’s cosmetic, but it signals the sealer has broken down and needs reapplication before the stone itself starts to deteriorate.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

For Irvine driveways, here’s what the work typically runs, and what drives the range:

  • Paver driveway installation: $7,000 – $18,000. Base prep, edge restraint, bedding sand, pavers, joint sand, compaction, and cleanup are included. The top of the range reflects larger driveways, premium profiles, curved layouts, and heavy excavation or base repair.
  • Concrete driveway installation: $4,500 – $12,000. Price moves with slab size, thickness, and whether the existing subbase needs replacement.
  • Driveway replacement: $5,000 – $14,000. Includes demolition and haul-away of the failed surface.
  • Driveway sealing: $250 – $700. A maintenance line item, not a repair – we recommend it after a fresh install has cured.

Upfront pricing means the number we quote is the number you pay – no change orders snuck in mid-project. And every driveway is backed by the 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space.

DIY or Call Us?

You can safely inspect your PGT driveway yourself: walk every course, note which stones rock or sit low, check the edge course for separation, and look for efflorescence or joint-sand washout. Those observations help us diagnose faster. Where homeowners get into trouble is re-bedding a single paver without correcting the base or slope underneath – the stone settles again in one wet season, and each attempt makes the surrounding course looser. Sealing is also easy to apply wrong: too much, too soon, and it traps moisture instead of releasing it, worsening the efflorescence you were trying to stop. The 60mm and 80mm vehicular courses need correct compaction to stay tight, and that’s the part you can’t feel your way through by hand. Call (888) 578-4462 and we’ll tell you exactly what needs to happen before the job starts.

FAQs

Need Construction help nationwide? Licensed & insured · free written estimates
Call (888) 578-4462
Local Service Coverage

Request a Free Estimate in Irvine

Tell us what you need - Groundwork Construction Co. of Irvine responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch