Fence
Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & paversFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Fence Installation: The Irvine Owner’s Guide
Unilock-compatible fence installation in Irvine typically runs $3,500 – $9,000, depending on linear footage, wall height, and whether we’re matching existing Unilock units or starting fresh. We don’t stock parts and we don’t sell parts – what we do is source the correct Unilock-compatible components and install them under our 730-Day Done Right Promise.
Owners usually find a problem in one of two ways. Either a post footing shifts after a wet winter and the panels start to lean, or a cap or corner block cracks and the whole run looks wrong from the street. In Irvine, we see both more often in HOA communities where the original installer used a lighter footing than the soil here actually needs.
Which Unilock Models This Applies To
Unilock is a hardscape manufacturer, not a fence brand in the traditional sense. Their fence systems are pillars and wall blocks – the Brussels Dimensional Stone line, U-Cara wall units, and the pillar caps that sit on top of fence columns. If your fence is a Unilock pillar-and-panel system, the parts that fail are almost always the pillar cap, the coping unit, or the concrete footing under the pillar itself. If your fence is a standard wood or vinyl panel attached to Unilock pillars, we’re matching the pillar finish and the panel hardware, not a Unilock part.
To identify what you have, measure a single pillar face. Brussels Dimensional units run in a set of face heights and lengths that a tape measure will confirm in under a minute. U-Cara units are larger and their texture is deeper. Take a photo of the cap from directly above with a tape measure laid across it – that single photo tells us more than any model number, and it’s how we source the correct replacement without ordering the wrong unit twice.
On OEM versus aftermarket: Unilock’s own units fit their own pillars correctly, and we use them when the color and texture need to match a run that’s still standing. Where an owner is rebuilding an entire fence line from scratch, a quality aftermarket pillar system often saves money without a visible difference. That’s a decision we make with you, not for you.
We are an independent service provider and are not affiliated with Unilock. We also install fence and hardscape for homeowners working with KraftMaid, Cambria, and Silestone on interior projects.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Fence Installation Is Failing
- Pillars leaning one direction after rain. The footing under the pillar was poured too shallow for Irvine’s clay-heavy soil, which swells and shifts with seasonal moisture. A pillar that leans a quarter inch today will be an inch out by next spring.
- Cap or coping blocks coming loose. Adhesive fails over time, especially on south- and west-facing pillars that take full afternoon sun. Once a cap lifts, water gets behind it and the freeze-thaw cycle in a cold snap finishes the job.
- Cracked block faces near the base. This usually means water is pooling at the footing and expanding when it freezes. It’s a drainage problem showing up as a masonry problem.
- Panels pulling away from pillars. Hardware or brackets loosen when the pillar and panel settle at different rates. Left alone, the gap widens and the panel weight starts working against the pillar.
- Efflorescence – white chalky staining on the face. Salt migrating out of the concrete or the soil behind it. It’s cosmetic in small amounts and a sign of a moisture problem in large amounts.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Installed Unilock-compatible fence work in Irvine runs $3,500 – $9,000 for a typical residential run. What pushes you toward the top of that range: taller pillars, a full tear-out and haul-away of the old footing, color-matching to an existing Unilock run, and any HOA-required architectural submittal. What keeps it closer to the low end: a repair to two or three pillars where the footing is sound and only the caps and coping need replacing.
We quote parts and labor as separate line items so you can see exactly what the Unilock-compatible units cost versus what the installation costs. The number you see on the signed estimate is the number you pay – no change orders for “unexpected” footing work we should have found at the estimate stage. Every installation is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
DIY or Call Us?
Here’s the honest split. You can safely check for loose caps by pressing on them, photograph your pillars for identification, and note where water pools against the base after a rain. That information helps us quote the job correctly.
What you shouldn’t do is re-set a leaning pillar yourself. A Unilock pillar and its paneling weigh several hundred pounds, and a pillar that comes down mid-job can break a hand or a foot – or take out a gas or irrigation line if the footing is near one. Digging out an existing footing in Irvine soil also means finding the actual depth, and a pillar re-set on a footing that’s still too shallow will lean again by the next wet season. If you’re looking at anything more than a loose cap, call us. We answer live, 24/7, at (888) 578-4462.
FAQs
A properly footed Unilock pillar system should hold for 20 years or more, and the block faces themselves often outlast the footing under them. The variable in Irvine is the soil, not the block – shallow footings in clay are what fail early, and that’s a footing problem, not a Unilock problem. Call (888) 578-4462 and we’ll tell you what we’d look for on your specific run.
Often, yes. A single leaning pillar with sound blocks can usually be re-set on a corrected footing, and caps and coping can be swapped without touching the rest of the run. Full replacement makes sense when three or more pillars in a line are moving, or when block faces are cracked through. Call (888) 578-4462 for a free estimate – we’ll tell you which side of that line you’re on.
A cap-and-coping replacement on a few pillars is usually a single-visit job. Re-setting footings and re-hanging panels runs longer, typically two to four days depending on how many pillars are involved. We give you a real timeline on the written estimate, not a range that moves once we’re on site. Call (888) 578-4462 to schedule your free estimate.
We order directly against your pillar’s measurements and finish, and we confirm the unit against a photo of your existing run before it ships. We don’t keep parts on hand and we don’t carry stock on a truck – each order is matched to your fence. Your measurements are what drive the order, and our technicians have up to 12 years of experience getting that match right. Call (888) 578-4462 for a free estimate and design consult.
If your Unilock fence in Irvine is leaning, cracking, or shedding caps, the fastest path to a straight answer is a phone call. We answer live, 24/7, at (888) 578-4462. Estimates are free, pricing is upfront, and every installation is backed in writing by our 730-Day Done Right Promise. From foundation to finish line, we handle the whole job – materials, footing, and finish – so you’re not chasing three different contractors to get one fence line right.
Written by the team at Groundwork Construction Co. of Irvine, serving Irvine and nearby areas.