Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
What cabinets and countertops work costs in Santa Ana, CA
Cabinets & Countertops in Santa Ana typically run $14,000 to $45,000 for a full tear-out and replacement, and most jobs land in the middle of that band. A straight cabinet swap with new counters takes about two to three weeks from demo to final caulk, and a modest single-wall kitchen can finish closer to ten days. Call (888) 578-4462 and we’ll put real numbers on your kitchen instead of a ballpark.
How a cabinet and countertop job actually runs, day by day
We don’t hand you a schedule that says “kitchen remodel” and disappear. Here’s the real sequence for a cabinets and countertops replacement, which is a tighter job than most homeowners expect.
Day 1: Demo and site protection. We pull the old doors, drawers, counters and backsplash, protect the flooring and mask off adjoining rooms. This is also when we open the walls behind the uppers and look at what’s actually there. In Santa Ana’s older homes, that first look is where surprises live: a shutoff valve frozen solid, a receptacle fed by cloth-wrapped wire, a wall that isn’t plumb. You decide at this stage whether we repair what we find or pause for a scope change. We don’t make that call for you.
Days 2 to 4: Rough-in and wall prep. If you’re moving the sink, the range, or adding a dishwasher, the plumbing and electrical get relocated now, before anything goes back in. We shim and scribe the walls so the new boxes sit flat. This is a two- to three-day stage on a normal kitchen; it doubles if you’re relocating a gas line and need an inspection before we close up.
Days 5 to 7: Cabinet installation. Base cabinets set and leveled, uppers hung, fillers and crown installed, doors and drawer fronts aligned. You’ll confirm hardware placement and any pull-out inserts during this window, because after the counters go on, changing your mind on a drawer divider is a five-minute fix but moving a bank of drawers isn’t.
Days 8 to 12: Template, fabrication and counter install. For quartz and granite, the fabricator templates the installed cabinets, cuts the slab, and returns to set it. That gap – typically five to ten business days – is the single most common reason a kitchen feels stalled. Laminate or butcher block can often be fabricated and set inside a day or two.
Final stage: sink, faucet, backsplash and punch list. The undermount sink gets set and sealed, the faucet connected, and the backsplash goes up if you’re including one. Then we walk the room together, check every door alignment and drawer glide, and you sign off. Our technicians have up to 12 years of experience on these installs, and they don’t leave until the punch list is empty.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll make, and what each one really costs you
Most of the sticker shock in a cabinets and countertops job comes from material grade, not labor. Here’s the honest trade-off on each decision you’ll face.
- Stock vs. semi-custom vs. custom cabinets. Stock boxes (fixed sizes, limited finishes) are the cheapest per cabinet but force awkward filler strips in an older kitchen that isn’t square. Semi-custom – what KraftMaid builds – lets you adjust widths and pick from a deep finish and door-style menu, which is where most Santa Ana homeowners land. True custom fits a 1920s kitchen with a chimney chase in the middle, and you’ll pay for it.
- Door material. Painted MDF faces take a clean finish and handle the dry heat well; solid wood doors expand and contract more across Santa Ana’s summer swings. Thermofoil is the budget choice and the one that peels first near a dishwasher or range.
- Quartz vs. granite vs. laminate. Quartz is non-porous, needs no sealing, and handles the region’s hard water better than most; it’s also the priciest of the three at the top end. Granite is heat-tolerant and each slab is one of a kind, but it wants re-sealing every year or two. Laminate has improved and costs a fraction, though it will scorch and it can’t take an undermount sink without a substrate build-up.
- Counter edge and thickness. A standard eased edge in 2cm or 3cm stock is baked into most quotes. A mitered or waterfall edge adds fabrication time and money, and it’s a look that reads best on an island, not a run of perimeter cabinets.
- Sink and layout. A single-bowl undermount changes the cabinet box below it; a farmhouse apron sink changes the cabinet front entirely. Decide before the boxes are ordered, not after.
What moves the price up or down in Santa Ana
The $14,000 to $45,000 range covers a lot of ground. Five variables decide where your job lands. For a broader look at how cabinets and countertops sit inside a bigger scope, see our Kitchen Remodeling in Santa Ana page.
Kitchen size and cabinet count. A galley kitchen with 14 linear feet of cabinets sits near the bottom of the range. A U-shaped kitchen with 30 feet of cabinetry, an island, and a pantry pushes toward the top. Cabinet count matters more than floor area.
Existing condition. Square walls and decent plumbing keep the number low. A Santa Ana bungalow with galvanized supply lines, a wall that’s out of plumb by an inch, or an old unpermitted addition that needs correcting before cabinets can hang will add to both labor and time.
Relocating plumbing, gas or electrical. Keeping the sink and range where they are is free. Moving either one means rough-in work, and moving a gas line means an inspection before the wall closes.
Material grade. This is the biggest single lever. Semi-custom cabinets and mid-grade quartz cost meaningfully more than stock boxes with laminate, and the finish holds up for decades instead of a handful of years.
Permit scope and inspection. A like-for-like cabinet and counter swap usually doesn’t require a permit. Relocating plumbing, gas, or electrical does, and that adds both the permit fee and inspection scheduling to the timeline. Every written estimate we hand you is line-itemed, with the number you see being the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhy Santa Ana’s older housing stock changes this job
Santa Ana was largely built between the 1920s and the 1960s, and that shows up the moment you pull the old cabinets off the wall. In the Wilshire Square and French Park neighborhoods, we regularly find knob-and-tube wiring feeding the kitchen receptacles, galvanized supply lines that have narrowed to a pencil’s width, and original wall framing that has settled out of square. None of that is a reason to walk away, but it does mean a cabinet job here requires more wall prep than it would in a newer build.
The city’s older structures also carry a paper trail. Unpermitted additions are common, and in some cases an enclosed porch or a converted garage sits behind the kitchen you’re trying to renovate. When that comes up, the scope stops being cabinets and countertops and starts being code compliance, and we’ll tell you that on day one rather than mid-job. On the plus side, Santa Ana’s semi-arid climate and mild winters mean rain rarely pushes the schedule, so fabrication gaps are easier to plan around than in coastal cities where moisture swings can delay counter templates.
We work across Santa Ana ZIP codes 92705, 92702, 92712 and 92725, and we see the same failure modes in each: swollen particleboard cabinet bases near the sink, thermofoil peeling off doors above the range, and laminate counters delaminating at the backsplash seam. Those are all fixable, and they’re all things we flag before the estimate gets written. If you’re already weighing a bathroom project at the same time, homeowners often pair this with Walk-In Showers & Shower Remodeling in Santa Ana or a Tub-to-Shower Conversion in Santa Ana, and we can quote both in one visit. View our full Santa Ana service list for the surrounding work.
Serving Santa Ana, CA – Our Local Coverage Area
We serve Santa Ana and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Cabinets & Countertops in Santa Ana, CA
Most jobs take two to three weeks from demo to final walkthrough, with five to ten business days of that being quartz or granite fabrication. Stock cabinets with laminate counters can finish in about ten days. Call (888) 578-4462 for a firm timeline after we see your kitchen.
A straight like-for-like replacement usually doesn’t require a permit. Once you relocate plumbing, gas, or electrical, you do, and that adds inspection scheduling to the timeline. We pull the permit for you and confirm the scope before anything starts.
Yes. Keeping the sink, the range, and every wall in place is the most common version of this job. New cabinets and counters go on the same footprint and the price stays toward the lower end of the range. Moving the sink or range is a separate, quoted scope.
Cabinet installation alone runs $4,000 to $13,000 and countertop installation runs $2,000 to $6,500, so the two together typically land between $14,000 and $45,000 depending on size and material grade. Call (888) 578-4462 for a written, line-itemed estimate.
Every job is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t done right, we make it right. Product warranties from makers like KraftMaid pass through to you in writing.
Get a free on-site estimate for your Santa Ana kitchen
Call (888) 578-4462 to schedule a free estimate and design consult. A live person answers around the clock, so you won’t sit in a voicemail queue. We’ll measure the space, check what’s behind the old cabinets, and hand you a written line-item quote for cabinets and countertops in Santa Ana. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available. Part of a larger renovation? Our Kitchen Remodeling service covers the full room.
Written by the team at Groundwork Construction Co.