Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Newport Beach, CA: What It Involves and What It Costs
Full kitchen remodeling in Newport Beach typically runs $14,000 to $45,000 for a complete tear-out and rebuild of the room, and most of those jobs take six to ten weeks from demo day to final inspection. That price covers new cabinetry, counters, backsplash, flooring, lighting, plumbing fixtures, and paint, with permits pulled and signed off. If your kitchen sits on Balboa Island or along the Peninsula, plan on adding time for coastal review. Call (888) 578-4462 to schedule a free on-site estimate, and we’ll walk the room with you before anyone touches a hammer.
How a Full Kitchen Remodel Actually Runs, Stage by Stage
We don’t hand you a start date and disappear. A full kitchen is a sequenced job, and each stage has decisions you need to make before the next one starts. Here’s the real order.
Stage 1: Design and permit package (week 1 to 2)
We measure the existing room, confirm what’s behind the walls, and lay out the new plan. By the end of this stage you’ve approved the cabinet layout, countertop material, and appliance list. We submit the permit package to the City of Newport Beach. On coastal properties, expect the plan to also run through Coastal Commission review, and that window is longer than a standard inland permit.
Stage 2: Demo and rough-in (days 1 to 5)
Day one is tear-out: cabinets, counters, flooring, and old drywall where needed. By day three we’re into rough framing, plumbing, and electrical. A kitchen where the sink and range stay put moves faster than one where you’re relocating a gas line or adding an island circuit. This is the stage where inspection stops the clock, so we schedule the rough-in inspection before the drywall goes back up.
Stage 3: Drywall, flooring, and paint (days 6 to 12)
Walls close back up, then flooring goes down before cabinets so the cabinet line sits on a finished surface. Paint happens now, before the cabinets are hung, because the room gets harder to mask once boxes are in.
Stage 4: Cabinet and counter install (days 13 to 21)
Cabinets set, then template for counters. Fabricators typically need a few days between template and install, and that gap is when the backsplash prep happens. Our cabinet and counter work is built around brand partners like KraftMaid and Cambria, and you’ll see the exact product line and finish before it’s ordered.
Stage 5: Fixtures, finish, and final inspection (days 22 to 40)
Plumbing fixtures, lighting, hardware, appliance install, and the final inspection. When we hand back the room, the work is covered by our 730-Day Done Right Promise. If it isn’t done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
A full kitchen forces a lot of decisions in a short window. These are the ones that carry the most weight, with the honest trade-off on each.
- Cabinet boxes: stock vs. semi-custom vs. full custom. Stock is the fastest and cheapest but limited on sizes, which leaves awkward gaps you fill with filler strips. Semi-custom lets you hit the wall exactly and is where most of our Newport Beach clients land. Full custom suits bayfront estates where nothing is square. KraftMaid covers the semi-custom range well.
- Countertops: quartz vs. natural stone vs. butcher block. Quartz is non-porous, consistent, and handles a busy kitchen. Natural stone like marble looks better in photos than in daily use near a range, because it etches. Butcher block is warm and forgiving but wants oiling.
- Undermount vs. farmhouse sink. Undermount is the workhorse and easier to replace later. Farmhouse gives you the deep basin and the look, but it’s heavier and the cabinet has to be built for it. Fixtures from Grohe hold up well near salt air.
- Hood and venting. Recirculating hoods are cheap and easy but don’t vent moisture or grease outside; ducted is the real answer and requires a path through the wall or roof.
- Lighting layers. A single ceiling fixture is a shortfall in any real full kitchen. Recessed cans plus under-cabinet task lighting plus pendants over an island is the standard we’re working toward.
What Full Kitchen Remodeling Costs in Newport Beach, CA
The Newport Beach price range for a full kitchen is $14,000 to $45,000. That range holds across the ZIP codes we work (92662, 92661, 92660, and 92659), though what pushes a job toward the top of it depends on a handful of real variables.
- Size and layout. Unless you have an unusual footprint, a galley or small galley-adjacent kitchen lands near the low end. An open-concept conversion lands near the high end because of the wall work.
- Relocating plumbing, gas, or electrical. Keeping the sink and range where they are saves real money. Moving a gas range or a sink requires rough-in changes and inspection, and that’s where a $14,000 job becomes a $22,000 one.
- Material grade. Standard cabinets and quartz push the total down. Custom cabinetry and natural stone push it up, and appliance package choices can swing it further.
- Existing condition. A 1950s bungalow on Balboa Island with a wood-frame kitchen that hasn’t been opened up may reveal moisture damage, old wiring, or a wall that needs structural work.
- Permit scope. Coastal-zone review adds cost and time, and any structural change (opening a wall, adding an island) requires a permit we pull for you.
What’s in a written estimate: cabinets, countertop material and install, backsplash, flooring, fixtures, lighting, paint, labor, permits, and disposal. Written line-item pricing means the number you see is the number you pay. What’s not in it: appliance costs (we can help you source them), any unforeseen structural or moisture repair found after demo, and HOA fees if one applies to your building.
See the difference
Before
After
Before
After
Before
AfterWhat Newport Beach Homes Specifically Do to This Job
Newport Beach construction is dominated by coastal and bayfront work, and a full kitchen in this city runs into permitting layers that an inland kitchen never sees. California Coastal Commission review applies to coastal properties, and plenty of kitchens on the Peninsula and along the bayfront are subject to Newport Beach’s own coastal and bayfront zoning overlays on top of the standard permit. On Balboa Island and the Peninsula specifically, you’re working on 1920s-to-1950s wood-frame bungalows and cottages packed tight to the neighbors on narrow lots, so material staging gets planned around alley access and inches of clearance. The marine layer and salt-laden air corrode fasteners, hinges, and hardware on the exterior-facing side of the room, and bayfront properties bring moisture and waterproofing concerns that change what we spec for backsplash backing and under-sink cabinetry. The upside: the mild Mediterranean climate gives us close to year-round exterior work, which keeps the interior stages on schedule. On the estate side, bayfront custom homes often pair a full kitchen with our kitchen remodeling service scope across the rest of the house, and we frequently see homeowners pair this with Full Bathroom Remodeling in Newport Beach while the crews are on site, or a walk-in shower refresh, which you’ll find at Walk-In Showers & Shower Remodeling in Newport Beach.
Serving Newport Beach, CA – Our Local Coverage Area
We serve Newport Beach and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Full Kitchen Remodeling in Newport Beach
Expect six to ten weeks from demo to final inspection. Coastal-zone permit review on Balboa Island or the Peninsula can add several weeks before demo starts, so ask for the permit timeline in writing during the estimate.
Yes, any full kitchen remodel that touches plumbing, electrical, or gas needs a permit, and coastal properties also require coastal-zone approval through the City and, in many cases, the California Coastal Commission. We handle the permit application and schedule the inspections. Call (888) 578-4462 for an estimate that includes permit scope.
Yes, and that’s usually the fastest and least expensive path. Keeping the sink, range, and walls in place eliminates rough-in changes and structural review. A full remodel that stays within the existing envelope still replaces cabinets, counters, flooring, and fixtures, but it runs closer to the low end of the range and shaves weeks off the schedule.
Plan on $14,000 to $45,000 depending on size, material grade, and whether the plan moves plumbing or electrical. Every estimate is line-item and written, and we don’t change the price once work starts unless you approve a change. Call (888) 578-4462 for an exact quote; estimates are free.
Every project is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If a cabinet door fails or a backsplash tile pops within that window, we come back and make it right. Call (888) 578-4462 to get your estimate started.
Get a Free Estimate on Your Newport Beach Kitchen
We’ll walk your kitchen with you, measure the room, and give you a written line-item estimate with no change orders hidden in it. A free design consult is included, and 0% financing for 18 months is available, along with $1,000 off projects over $10,000. Live people answer our phones around the clock, so you’re never stuck in voicemail. Call (888) 578-4462 to set up your free estimate for Kitchen Remodeling in Newport Beach.
If your project expands past the kitchen, those inquiries route through our Kitchen Remodeling service, and we cover the wider area reachable through our Newport Beach service-area page.
Written by the team at Groundwork Construction Co.