A Groundwork company - serving Irvine, CA
New Detached ADU in Westminster, CA | Groundwork Construction Co. of Irvine

New Detached ADU in Westminster - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Westminster: What It Costs and How Long It Takes

A new detached ADU in Westminster typically runs $90,000 to $220,000 for a full second dwelling, while a leaner build or a partial scope covered under our additions work lands closer to the $45,000 to $130,000 band. Plan on 8 to 14 months from first call to final inspection: roughly 2 to 4 months of design and city plan check, 1 to 2 months of site work and foundation, 3 to 5 months of framing through finish, then final sign-off. Call (888) 578-4462 for a free on-site estimate before you commit to a number.

Call (888) 578-4462

How we build a detached ADU here, stage by stage

The order of operations matters more than any single material choice you’ll make. Here’s the sequence, with what you decide at each point.

Stage 1: Site walk and feasibility (day 1 to week 1). We measure your lot, check setbacks on the rear and side yards, and confirm utility runs from the main house. You’ll decide the footprint – a 500 sq ft studio versus an 800 sq ft one-bedroom – and whether the unit shares your existing sewer lateral or needs a new tap. Most Westminster lots on the 92683 grid behind Beach Blvd can take a 600 to 750 sq ft unit without touching the primary structure.

Stage 2: Design and plan check (month 1 to month 4). Drawings go to the city, and you pick your exterior finish now, because stucco versus James Hardie siding and the roof material all get locked into the submitted set. Plan check is the longest wait you don’t control. Two rounds of corrections are common when a lot sits close to a property line.

Stage 3: Site prep, foundation, and rough-in (month 4 to month 6). We clear the pad, form and pour the slab, then run water, sewer, and electrical stubs. This is the stage where a surprise hits – an old lateral, a shallow line, a piece of abandoned concrete. You’ll approve any change in writing before we proceed. No change orders signed under pressure.

Stage 4: Framing through envelope (month 6 to month 9). Walls, roof, windows, and stucco go up. Rough framing, electrical, plumbing, and mechanical inspections happen here, then insulation and drywall. You’ll decide interior layout now if you haven’t, including whether the bathroom shares a wet wall with the kitchen to save on rough-in cost.

Stage 5: Finish, punch, and final (month 9 to month 14). Flooring, cabinets, fixtures, paint, and landscape repair. Final inspection and utility meter sign-off close the job. We walk the unit with you, list every punch item, and fix them before we call it done. The 730-Day Done Right Promise starts the day you sign off.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll actually choose between

  • Slab-on-grade versus raised floor. Slab is cheaper, drains better here, and suits the flat lots between Brookhurst and Beach. Raised floor costs more but gets you above grade if the backyard holds water in a wet winter.
  • Stucco versus James Hardie siding. Stucco matches Westminster’s 1950s and 60s tract houses and holds its color well in dry Santa Ana heat. Hardie siding costs more up front but resists the marine-layer moisture that can drive stucco cure slow in early summer.
  • Roof: asphalt shingle versus standing-seam metal. Shingle from GAF or CertainTeed is the budget play and gets you 20-plus years. Metal costs more and reflects heat, which matters if you’re renting the unit out and paying for the AC.
  • Kitchen and bath fixtures. Standard builder-grade versus a name like Grohe in the shower. Premium fixtures cost more but generate fewer service calls in a rental unit over the first decade.
  • Own meter versus shared utilities. A separate electrical meter adds cost but simplifies renting. Shared meters are cheaper to build but muddy the question of who pays the bill.

What New Detached ADU costs in Westminster, CA

For a fully detached, habitable second unit in Westminster, expect $90,000 to $220,000. Our additions-side range of $45,000 to $130,000 covers smaller or partial builds – a detached studio, a shell without a full kitchen, or a project that reuses an existing slab.

Five variables push a job from the low end to the high end:

  • Size. A 400 sq ft studio at the bottom of the range; an 800 sq ft one-bedroom near the top.
  • Site conditions. Flat, clear lots cost less. A lot with a slope, mature trees, or an old shed to demo adds cost.
  • Utility distance. Running a new sewer lateral and water line from the street to a rear unit can add meaningful cost that a front-of-lot build avoids entirely.
  • Material grade. Builder-grade finishes versus premium. Cabinets, counters, and fixtures are the biggest swing.
  • Permit and inspection scope. A full habitable ADU with its own meter and fire separation costs more to permit than a partial build.

Your written estimate line-items every one of these. What it does not include until you ask: landscape beyond basic repair, fencing, and any work on the primary house.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Westminster homes specifically do to this job

Most of the Westminster lots we build ADUs on carry a 1950s to 1970s single-story stucco tract house, often on a small lot squeezed between Beach Blvd and Brookhurst St. The old sewer laterals and water lines to those homes are frequently the first surprise – a rear-yard ADU needs a clean path to the main, and a 60-year-old clay lateral may not survive a new tie-in. We test before we design. On a shared lot, that sometimes means repositioning the unit closer to the alley to shorten the run.

Parking on these narrow lots is a real constraint. A new unit needs its own address, and in some cases a dedicated parking spot, which changes where the pad can sit. And if you’re building an ADU while also touching the kitchen or a rental unit – many Westminster families build the backyard unit for a parent or grown child, then update the primary home’s kitchen and floors in the same season – homeowners often pair this with Kitchen Design & Layout in Westminster.

Plan check timing swings with the season and the completeness of the submittal. We handle the city plan-check process from first submission to final sign-off, and we pull permits and pass inspections rather than working under the radar.

The build itself is a full project under our Home Additions & ADU in Westminster scope, and you can read the wider picture on our Home Additions & ADU service hub. We cover all of Westminster, including the 92683, 92684, and 92685 ZIP codes. Many of our projects also pair a new detached unit with Backsplash, Tile & Flooring in Westminster to finish the primary house in the same trip.

Serving Westminster, CA – Our Local Coverage Area

We serve Westminster and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Westminster

Schedule your free ADU estimate in Westminster

A new detached ADU in Westminster is a major build, and the number you commit to should be a written line-item bid, not a verbal ballpark. Call (888) 578-4462 to schedule a free on-site estimate. We’ll walk your lot, talk through setbacks and utilities, and hand you a fixed price with no change-order surprises. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.

Written by the team at Groundwork Construction Co.

Why Westminster Chooses Groundwork Construction Co. of Irvine

We set the standard for new detached ADU in Westminster.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Westminster

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Westminster Customers Say

Trusted by homeowners across Westminster and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ready for New Detached ADU in Westminster?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Westminster.

(888) 578-4462

Request a Free Estimate in Westminster

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch