Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
PGT Home Additions & ADU: The Irvine Owner’s Guide
Quick answer: We build PGT-compatible home additions and ADUs in Irvine, with typical installed projects running $45,000 – $130,000 for additions and $90,000 – $220,000 for a full ADU. These are permitted, inspected projects, not same-day installs. Most Irvine owners discover their PGT addition has a problem quietly, over months: a hairline crack that widens across a stucco wall, a slider that starts dragging in August heat, or a soft spot near a roofline where a PGT window meets the new framing. If you’re past the planning stage and need the part matched, priced, and installed correctly, you’re in the right place.
Which PGT Models This Applies To
PGT makes impact-rated windows and patio doors sold throughout Southern California, and in Irvine those units show up constantly in additions and ADUs where the new square footage has to meet the same wind and impact code as the original house. The parts that matter most here are the window and door units themselves, their hardware, and the framing and flashing around them. PGT stamps a series label on the glass spacer or the jamb, and that label is the only reliable way to match a replacement sash, screen, or operator. Guessing from a photo gets you the wrong unit.
On the OEM-versus-aftermarket call: for an impact-rated PGT unit in an Irvine addition, the glass and frame need to match the label’s design pressure rating, because your permit and inspection are tied to that spec. A generic aftermarket sash may fit the opening and still fail the impact requirement. The safe read is to pull the label, match the spec exactly, and only substitute a non-OEM part on interior trim and hardware where the rating doesn’t apply. We are an independent service provider and not affiliated with PGT.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your PGT Home Additions & ADU Is Failing
- A patio door that drags or won’t latch. The roller assembly or track has worn, and in Irvine’s summer heat the frame can shift enough to throw the geometry off. This is a hardware and alignment fix before it becomes a frame replacement.
- Water staining or soft drywall beside a PGT window. Flashing at the window-to-wall junction has failed, letting wind-driven rain in during the Santa Ana wind events. Left alone, this reaches the framing within a season.
- A foggy or hazy glass panel. The sealed unit’s spacer has failed and moisture is between the panes. Impact glass doesn’t repair itself; the unit gets replaced.
- Cracks in the stucco at the addition’s roofline. Settlement or a truss connection issue, not a cosmetic problem. This one earns a real inspection.
- A screen or sash that won’t stay in its track. Worn pivot hardware or a bent frame section. Cheap to fix early, more costly after it damages the track.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Irvine, a home addition runs $45,000 – $130,000 and a full ADU runs $90,000 – $220,000. A garage conversion sits at $30,000 – $80,000. That range is driven by square footage, whether the site needs grading or a new foundation depth, how many PGT impact windows and doors the plan calls for, and how much MEP work is involved.
For a single failed component inside an existing addition, a door hardware swap might be a few hundred dollars; a failed PGT sealed unit replacement runs more, and the exact figure depends on the unit’s size and rating. Our pricing is upfront: the number we quote is the number you pay, and every project is covered by our 730-Day Done Right Promise. Permits are pulled and inspections passed as part of the scope.
DIY or Call Us?
You can safely check some things: read the PGT label, wipe the track, look for water stains, and photograph the crack. But structural work on an addition, and any replacement that touches the impact-rated envelope, is where owners get hurt. Cutting into a load-bearing wall, reworking the flashing at a window-to-roof junction, or cracking into a stucco wall to chase a settlement crack can turn a small repair into a permit problem and real damage. There’s no live high-tension or electrical hazard in a window swap, but the wrong move on framing or the building envelope is still a costly one. That’s the point to call, not push through. Call (888) 578-4462 and we’ll tell you honestly whether it’s a quick fix or a real repair.
FAQs
Expect 20 – 25 years for a PGT impact unit under normal conditions, though Irvine’s inland heat and Santa Ana dust cut that toward the low end if hardware and flashing aren’t maintained. Call (888) 578-4462 for an exact quote – estimates are free.
Often yes. A dragging door, worn rollers, a bad latch, or a failed screen usually can be repaired, while a fogged sealed unit or cracked frame cannot and needs replacement. We’ll inspect and tell you which it is.
A single hardware or unit swap is usually a day; a full addition or ADU build takes weeks to months depending on scope and inspection schedules. Call (888) 578-4462 for a written timeline on your project.
We match the part to the label on your unit, order the correct spec for your impact rating, and confirm it before install. We don’t carry PGT parts on a truck, so expect a short lead time on special-order units.
For your free estimate on a PGT home addition or ADU in Irvine, call (888) 578-4462. Live person, 24/7 – no voicemail, no waiting until Monday.
Written by the team at Groundwork Construction Co. of Irvine, serving Irvine and nearby areas.